Free Download Microsoft 70-247 Practice Tests with PDF & VCE (51-60)

QUESTION 51
Your network contains a System Center 2012 Virtual Machine Manager (VMM) infrastructure. The infrastructure contains 50 Hyper-V hosts.You plan to deploy Power Optimization for VMM.
You need to prepare the infrastructure for the planned deployment. What should you do? (Each correct answer present part of the solution. Chose two.)

A.    Install a Baseboard Management Controller (BMC) on each Hyper-V host.
B.    Enable Dynamic Optimization.
C.    Enable Hibernation.
D.    Enable Performance and Resource Optimization (PRO).
E.    Install a configuration provider on each Hyper-V host.

Answer: AB
Explanation:
A: To use Power Optimization, the host computers must have a BMC that enables out-of- band management.
B: Power Optimization is an optional feature of Dynamic Optimization, and it is only available when a host group is configured to migrate virtual machines through Dynamic Optimization.
Reference: Configuring Dynamic Optimization and Power Optimization in VMM

QUESTION 52
Your network contains a domain named adatum.com. The domain contains five virtualization servers. The servers are configured as shown in the following table.

image
You need to ensure that you can add all of the servers to the VMM fabric.
Which two actions should you perform? (Each correct answer presents part of the solution. Choose two.)

A.    Upgrade Host1 to Hyper-V Server 2008 R2 Service Pack 1 (SP1).
Server3 Microsoft SQL Server Reporting Services
B.    Upgrade Host2 to Hyper-V Server 2008 R2 Service Pack 1 (SP1).
Server4 Microsoft SQL Server
Host11 Windows Server 2008 Service Pack 2 (SP2)
C.    Install Hyper-V Server 2008 R2 Service Pack 1 (SP1) on Host3.
Hyper-V server role
D.    Install Hyper-V Server 2008 R2 Service Pack 1 (SP1) on Host4.
Host2 Microsoft Hyper-V Server 2008 R2
E.    Install Hyper-V Server 2008 R2 Service Pack 1 (SP1) on Host5.
Host3 Microsoft Virtual Server 2005 R2
Host4 VMware ESX Server 2.5
F.    Uninstall VMware vCenter from Server1.
Host5 VMware ESX Server 3.5
Server name Server configuration

Answer: CD
Explanation:
VMM1 1 GB of RAM x64 architecture Windows Server 2008 Service Pack 2 (SP2) System
Center Virtual Machine Manager (VMM) 2008 R2 Service Pack 1 (SP1)
http://technet.microsoft.com/en-us/library/gg610649
SQL1 1 GB of RAM x64 architecture Windows Server 2008 Service Pack 2 (SP2) Microsoft http://technet.microsoft.com/en-us/library/hh430991
SQL Server 2008 Express

QUESTION 53
You plan to deploy a service named Service1. When you deplay Service1, you plan to deploy several SQL scripts to a virtual machine named VM1 by using an Application Profile. You need that ensure that a user named User1 is prompted for the name of the SQL instance during the deployment of Service1.
Which value should you add to the Application Profile?

A.    $SQLServerInstanceName$
B.    #SQLServerInstanceName#
C.    @SQLServerInstanceName@
D.    %SQLServerInstanceName%

Answer: C
Explanation:
https://blogs.technet.com/b/scvmm/archive/2011/09/27/vmm-2012-sql-server-profile.aspx?Redirected=true

QUESTION 54
You have a virtual application package named App1.
You need to deploy App1 to a test environment. Which
Windows PowerShell cmdlets should you use?

A.    New-ServerAppVSequencerPackage and Set-ServerAppVPackageConfiguration
B.    Add-ServerAppVPackage and Set-SCApplicationPackage
C.    Add-SCApplicationDeployment and Start-ServerAppVPackage
D.    Add-ServerAppVPackage and Start-ServerAppVPackage

Answer: D
Explanation:
http://technet.microsoft.com/en-us/library/gg703267
http://blogs.technet.com/b/serverappv/archive/2011/05/12/how-to-manage-virtual-applications-using-the- server-app-v-agent-cmdlets.aspx

QUESTION 55
Your company has a private cloud managed by a System Center 2012 Virtual Machine Manager (VMM) infrastructure.
You need to add a hardware load balancing solution to the private cloud. You deploy the hardware load balancer to the network.
What should you do before you add the hardware load balancer to the fabric? (Each correct answer presents part of the solution, Choose two.)

A.    Create a logical network.
B.    Create a VIP template.
C.    Create a Run As Account.
D.    Install a configuration provider.
E.    Install the Network Load Balancing (NLB) feature.
F.    Create a User Role.

Answer: BD
Explanation:
B: Before you can use a hardware load balancer or NLB, you must create associated virtual IP (VIP) templates.
D: To add supported hardware load balancers, you must install a configuration provider that is available from the load balancer manufacturer.
Reference: Configuring Load Balancing in VMM Overview

QUESTION 56
Your company has a private cloud that is managed by using a System Center 2012 infrastructure. The infrastructure contains multiple servers that have Data Protection Manager (DPM) installed. A DPM server named Server1 is running out of hard disk space. You add additional physical hard disks to Server1. You verify that the additional disks are available from the local Disk Management console. You need to ensure that the additional disk space can be used to store DPM backups. What should you do?

A.    From the DPM Administrator console, click Refresh.
B.    From the DPM Administrator console, click Disk Allocation.
C.    From the DPM Administrator console, click Add.
D.    From the DPM Administrator console, click Rescan.

Answer: C

QUESTION 57
Your company has a private cloud that is managed by using a System Center 2012 infrastructure. You have a web application named WebApp1 that is hosted in another datacenter. The datacenter is not part of the private cloud. You need to ensure that Service Manager incidents are generated automatically when WebApp1 is unavailable. What should you create?

A.    a Service Level Tracking object
B.    an event rule
C.    a synthetic transaction
D.    a service offering

Answer: C

QUESTION 58
Your company has a private cloud that is managed by using a System Center 2012 infrastructure. The network contains 50 virtual machines that run Windows 7. Each virtual machine has an application named Appl.exe installed. A new version of Appl.exe is released. You need to identify which virtual machines have the outdated version of App1.exe installed. What should you do?

A.    From Operations Manager, create a monitor.
B.    From Configuration Manager, deploy a Desired Configuration Management baseline.
C.    From Service Manager, create a Virtual Machine Manager (VMM) connector.
D.    From Virtual Machine Manager (VMM), deploy a service template.

Answer: B

QUESTION 59
You have a SAN that contains SSD, SAS, and SATA drives. The SAN contains RAID0 physical partitions and RAID5 physical partitons for each hard disk drive type.
You install System Center 2012 Virtual Machine Manager (VMM).
You need to create 10 LUNs for each RAID type and disk type. The LUNs must be organized based on the disk type.
What order should you perform the listed actions from the VMM Administrator Console? (To answer, move all the actions from the lsit of actions to the answer area and arrange them in the correct order.)

image
Answer:

image
Explanation:
http://technet.microsoft.com/en-us/library/gg610600

QUESTION 60
Your company has a datacenter in London. Your network contains an Active Directory forest named adatum.com.
You have a SAN that contains SSD, SAS, and SATA drives. The SAN contains RAID0 physical partitions and RAID5 physical partitons for each hard disk drive type.
You install System Center 2012 Virtual Machine Manager (VMM).
You need to create 8 LUNs for each RAID type and disk type. The LUNs must be organized based on the disk type.
Which four actions should you perform from the VMM Administrator Console? (To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.)

image
Answer:

image
Explanation:
http://technet.microsoft.com/en-us/library/gg610600

If you want to pass Microsoft 70-247 successfully, donot missing to read latest lead2pass Microsoft 70-247 practice exams.
If you can master all lead2pass questions you will able to pass 100% guaranteed.

http://www.lead2pass.com/70-247.html

         

Why Choose Lead2pass?

If you want to pass the exam successfully in first attempt you have to choose the best IT study material provider, in my opinion, Lead2pass is one of the best way to prepare for the exam.

Lead2pass Testking Pass4sure Actualtests Others
$99.99 $124.99 $125.99 $189 $29.99-$49.99
Up-to-Dated
Real Questions
Error Correction
Printable PDF
Premium VCE
VCE Simulator
One Time Purchase
Instant Download
Unlimited Install
100% Pass Guarantee
100% Money Back